The industrial deep-dive audit.
Compressed to 2 weeks.
A full ISO-50002 audit — now delivered in 2 weeks instead of 10. Electrical portion funded by Hydro-Québec's Efficient Solutions Program. Requires your team's engagement.
2 weeks of collaboration with your team.
This isn't a drop-ship audit. We do it WITH your people, not FOR them. Here's what we'll need — and what it'll cost in team-time.
Motor lists + asset data
Nameplate data, HP, operating hours, sub-meter records for the major process areas. We work from what you have — no new instrumentation required.
Data access
Utility bills (12 months), interval meter data if available, SCADA/BMS exports for key processes. Read-only, NDA-protected, returned at the end.
Site visit
One day on-site. Guided walkthrough of major processes, sampling of key motors and loads, photos and field notes. Opnor engineer + one of your ops leads.
Joint meetings
Three meetings with your leadership: scoping kickoff, mid-point findings preview, final results + recommendations walk-through.
An engineering-grade audit. Decision-ready.
Every deliverable is something you can hand to a board, a plant manager, or an implementation contractor. No open-ended consulting notes.
Same ISO-50002 scope. AI-accelerated analysis.
Traditional deep-dives spend 8–10 weeks on analysis work an AI can do in hours: utility-bill reconciliation, baseline regression, ECM library matching, report drafting. Field work and engineering judgement stay human.
The compression is entirely on Opnor's analysis side. Your team's involvement — the site visit, the data pull, the meetings — is the same as a traditional deep-dive. We just don't make you wait 10 weeks for the answer.
Transparent pricing. Hydro-Québec-funded when eligible.
Fixed-price engagement tied to scope. No hourly billing. Most Quebec industrial clients pay $6K–$22K net after Hydro-Québec's SEA funding.
See the format up front.
A synthesized example of the deliverable format. Shape, sections, and engineering depth match what you'll receive — specific numbers, plants, and clients are synthetic. Real client-approved case studies will replace this as they publish.
15–20 ECMs identified · 10–15% annual savings band
Every audit ships with the same core deliverables. What changes plant-to-plant is the ECM list, the capex figures, and the HQ-funding profile.
- Executive summary with ranked ECM list
- Baseline energy model and reconciliation
- Per-ECM engineering write-up + AACE-class estimate
- Hydro-Québec SEA application (pre-filled)
- Implementation roadmap with phased priorities
- All raw data and models — yours to keep
The audit details, up front.
2 weeks. Funded by Hydro-Québec.
Let's scope yours.
30-minute scoping call. We confirm SEA eligibility, sketch the ECM landscape, and send a fixed-price SOW within 48 hours. No commitment.