ENERGY-OS · EMIS · Hydro-Québec-ready

Verify every kWh of savings.
Automatically.

Opnor EMIS monitors your implemented ECMs against their engineered baseline — continuously, automatically, to IPMVP and ISO-50015 compliance. Your Hydro-Québec post-measurement reports write themselves. Your CFO sees real savings, not projected ones.

IPMVP Option A/B/C/D · ISO-50015 · HQ Solutions efficaces M&V format
energy-os · emis · livesample
streaming · 5 min intervals
Month-to-date
−11.2%
vs baseline
YTD saved
728 MWh
~ $51K
Status
ON TRACK
9 of 11 ECMs green
monthly electrical · MWh · baseline vs actual
last update 2 min ago
700800ECM-KICKOFFJFMAMJJASOND
5-min
streaming interval
SCADA · BMS · utility portals
11+
integrations
Rockwell · Siemens · Schneider · HQ feeds
IPMVP
compliance-native
Option A · B · C · D supported
P.Eng.
signatory-ready
auto-generated, human-signed reports
01 · Continuous M&V

Live baseline-vs-actual. Every meter. Every ECM.

Opnor EMIS ingests your utility meters, sub-meters, and process-level signals at 5-minute intervals. Normalizes everything against an engineered baseline model (weather, production output, operating hours). Flags variance as it happens.

  • Regression-based baseline with P.Eng. sign-off — not a rolling average
  • Weather + production normalization — separates savings from operational drift
  • Per-meter, per-ECM, and whole-facility variance views
  • 5-min streaming interval · stored indefinitely · API-queryable
energy-os · emis · livesample
streaming · 5 min intervals
Month-to-date
−11.2%
vs baseline
YTD saved
728 MWh
~ $51K
Status
ON TRACK
9 of 11 ECMs green
monthly electrical · MWh · baseline vs actual
last update 2 min ago
700800ECM-KICKOFFJFMAMJJASOND
02 · Realization-factor tracking

Which ECMs are delivering. Which aren't.

Every implemented ECM gets tracked against the savings that were engineered for it during the audit. When realization drops below threshold, we flag it — usually early enough to troubleshoot before it becomes a quarterly miss.

  • Per-ECM realization factor — measured savings as % of modeled savings
  • Three-tier alerting: green (≥90%), amber (70–90%), red (<70%)
  • Root-cause hints — points at likely causes (commissioning drift, sensor failure, operational change)
  • Monthly portfolio view — executive-ready rollup across all active ECMs
energy-os · emis · ecm portfoliosample
11 ECMs · month 7 of 12
Average realization
88%
At-risk ECMs
1
Next recertification
Nov 2026
ECMMeasureModeledActualVarReal.
ECM-01Kiln VFDs (Bank A)487 MWh462-2595%
ECM-02Compressed air leak program312 MWh298-1495%
ECM-03Cooling-tower fan right-sizing208 MWh176-3285%
ECM-04Heat recovery on boiler stack144 MWh87-5760%
ECM-05Conveyor drive VFDs96 MWh94-298%
ECM-06Green-chain LED retrofit62 MWh61-198%
ECM-04 under-performing. Heat recovery at 60% realization · flag raised 12 days ago · recommend field verification
03 · Compliance reporting

IPMVP, ISO-50015, Hydro-Québec. Reports that write themselves.

Every period end, EMIS auto-generates the M&V reports your compliance stakeholders need. IPMVP Option C whole-facility regression, Hydro-Québec post-audit savings verification, ISO-50015-conformant annual measurement reports. P.Eng. sign-off included.

  • IPMVP Options A, B, C, D supported out of the box
  • Hydro-Québec Solutions efficaces post-measurement report format
  • ISO-50015 annual energy performance reports
  • Custom internal rollups — brand + format configurable
  • Every report carries a P.Eng. signature line · auditable source data retained
energy-os · emis · compliance reportsample
auto-generated · Nov 2026
IPMVP Option C · Whole-Facility · annual M&V
Post-implementation savings report
12-month measurement period · reporting year 1
Measurement protocolIPMVP Option C · whole-facility regression
Baseline period12 months · pre-implementation
Reporting period12 months · post-implementation
NormalizationHDD · CDD · production output
Baseline R²0.94
Verified savings728 MWh · $51,040
Realization factor88% portfolio average
HQ program eligibilitySolutions efficaces (SEA) · verified
P.Eng. signatory · ready for upload
✓ IPMVP · ✓ ISO-50015 · ✓ HQ SEA format
04 · Integrations

Works alongside your existing SCADA, BMS, and utility data.

EMIS is a read-only overlay — not a rip-and-replace. We connect to your existing data sources, normalize everything to IPMVP-grade baselines, and leave your operational systems untouched.

SCADA
Rockwell FactoryTalk
BMS
Siemens Desigo CC
BMS
Schneider EcoStruxure
SCADA
Ignition SCADA
Utility feed
Hydro-Québec
Utility feed
Énergir
Open protocols
Modbus · BACnet · OPC-UA
Custom ingest
CSV · SQL · REST
05 · Pricing

Subscription. Priced per site.

No per-meter gotchas. No data-volume tiers. Sized to your site — depends on ECM portfolio depth, integration scope, and how complex your facility is. We'll quote firm numbers after a quick scoping conversation, not on the marketing page.

subscription · annual term
quote sized to scope
Pricing model
Subscription · annual term · priced per site
Scope drivers
ECM count · SCADA / BMS integrations · M&V protocol depth · multi-site count
Setup
One-time engineering for baseline modelling + integration setup (P.Eng. sign-off included)
Multi-site
Volume pricing across 3+ sites under common ownership
Hydro-Québec SEA eligibility
Post-audit M&V costs partially eligible for program reimbursement
Term
Annual · 60-day cancellation notice
Sized after a 30-min scoping call · ECM portfolio + integration scope determine the number
Curious about EMIS?

30 minutes. No prep needed.
We'll walk you through it.

A guided walkthrough of the platform plus Q&A on whether EMIS fits your facilities setup. Bring questions, not data — we won't try to wire anything up live on the call.

No commitment · No live wiring · No data sharing required